The general contractor applied touch-up paint in the auditorium.
The sprinkler contractor installed sprinkler heads in the 1st Floor lounge.
The furniture vendor completed furniture installation in all 3rd Floor offices.
LSUHSC Facility Services continued electrical repairs and painting on the 2nd and 3rd Floors.
LIONS/LSU
CLINIC PERMANENT REPAIRS AND MITIGATION:
The contractor continued installing window trim for the exterior stairwell on the 6th level and patching sheetrock inside the stairwell on the lower floors.
LIBRARY
COMMONS:
The contractor installed two return air grilles and one access panel in the elevator lobby.
RESIDENCE
HALL LOBBY EXPANSION:
The interior contractor continued patching walls where the fire alarm devices were installed in the lobby.
The mechanical contractor installed plenum boxes along the expanded storefront windows.
MEB
2nd FLOOR LOBBY RENOVATIONS:
The contractor finished installing all surface mount lights.
The wall panel contractor continued installing wall panels on the Campus Office Stores side of the lobby.
MEB
PHARMACOLOGY LAB RENOVATIONS:
The contractor installed ceiling tiles in the administrative and lab areas.
The network wiring contractor started pulling network wires.
ALLIED
HEALTH/NURSING RE-ROOFING PROJECT:
The contractor removed the old roof materials, installed new insulation and a cap sheet for the 4th Floor lower level roofs.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The contractor painted the 1st coat of paint in Room 4202B.
The contractor installed an additional row of ceiling tiles in Auditorium A.
The electrical contractor pulled wires for the electrical transformers and panels in Auditorium B.