Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, JUNE 1, 2009

 

DENTAL SCHOOL PARKING LOT AND ROAD REPAIRS: Parking Lots Two and Six (between the Army Parkway entrance road and the Navy Parkway exit road) are scheduled to be leveled, paved and repainted beginning Monday, June 1st, and going through Sunday, June 14th. 

  • In order to complete the work, the contractor must close the Army Parkway entrance.  Traffic will be directed to enter the School of Dentistry campus by way of the Castine Street entrance. 
  • The Navy Parkway exit will remain in service during the paving.  Detour signs will be posted to clearly indicate the route. 
  • The paving contractor will also be repairing the driveway that connects Campus Road to Moss Street . 
  • Various other driveway transitions and patches will be made over the next two weeks.  Please drive with caution, watch for workers making these repairs and obey the temporary signage. 
  • Work began today.

 

1542 TULANE AVE. :

  • The contractor capped plumbing lines in the old section. 
  • Facility Services continues painting and on the 2nd Floor.

 

EXTERIOR/LANDSCAPING:

  • Facility Services installed irrigation piping along Bolivar St. adjacent to the Residence Hall.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:   

  • The electrical contractor removed wire from the old switchgear. 
  • The mechanical contractor disconnected all piping and electrical wiring from the old generator in preparation for removal.

 

LIONS BUILDING 8th FLOOR NETWORK CLOSET:

  • The contractor continued framing and installing sheetrock.

 

LIBRARY COMMONS:

  • The restoration specialist continued repairing the frieze.
  • The contractor continued framing and installing sheetrock for the center stairwell wall.
  • Workers installed cove base in the back office area.

 

RESIDENCE HALL 2ND FLOOR LOBBY EXPANSION:

  • The interior contractor roughed in junction boxes for the track light in the expanded ceiling area. 
  • The contractor ran wires for the security camera between the B & C Tower lobby areas.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floor, Quadrant D.
  • The contractor removed and disposed of the old AHU 6D, AHU 7D and associated supporting equipment on Friday night and Saturday.  
  • The new AHU 6D, AHU 7D, fans and some of the ductwork were installed on Sunday.  
  • Additional duct work was installed and exhaust fan connections were made today.

 

MEB 2nd FLOOR LOBBY RENOVATION:

  • The contractor began installing wooden wall panels by Lecture Hall B.

 

MEB MDL #3 RENOVATIONS:

  • The contractor installed sheetrock and roughed in electrical for the alcove area across from MDL #5.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor installed furniture in the administrative area.

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor installed the cap sheet on the main roof to the elevator penthouse. 

     

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The electrical contractor installed wiring for the fire alarm devices in Auditoriums A and B, the 4th Floor elevator lobby, and the 4th Floor walkway.
  • The contractor finished installing the acoustical panels in Auditorium A and installed framing for the acoustical wall panels along Florida Ave. in Auditorium B.