Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JUNE 18, 2009

1542 TULANE AVE.:

  • The contractor installed carpet in offices along the center corridor on the 2nd Floor.
  • Facility Services continues to apply touch-up paint in offices on the 2nd Floor.
  • They began making electrical repairs in Room 240A.
  • The contractor installed a new light fixture above the driveway entrance to the parking garage.

EXTERIOR/LANDSCAPING:

  • Facility Services continued trenching for irrigation piping around the Roman St. Garage along Bolivar Street and Tulane Avenue.

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor continued working on the 6th floor punch list.

LIONS/LSU CLINIC WALKWAY DOORS:

  • The contractor removed the walkway surface.

ALLIED HEALTH/NURSING BLDG RE-ROOFING PROJECT:

  • The contractor installed walk pads near Perdido Street.

LIBRARY COMMONS:

  • The contractor continued finishing the sheetrock in the stairwell.

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor framed up the soffit ceiling in the recreation room.
  • The interior contractor continued sanding and floating the ceiling in the expanded lobby area.

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services removed temporary units from Quadrant D and continued shifting temporary units into Quadrant C of the 6th and 7th Floors.
  • The contractor continued balancing AHU 6D and 7D.

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The wall panel contractor continued installing metal trim and wood panels on the television monitor wall.
  • The contractor began installing electrical outlets on the walls with wood panels and installed sconce lights by the metal panels.

MEB MDL #3 RENOVATIONS:

  • The contractor continued relocating sprinkler heads in the main MDL room.
  • Crews continued installing valves for air, gas, and vacuum.
  • Workers installed light fixtures in the main MDL room.

MEB PHARMOCOLGY RENOVATIONS:

  • The contractor continued completing punch-list items.

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The electrical contractor installed the last exit sign in Auditorium B and finished programming the dimmers.
  • The contractor continues to install the custom baseboard for Auditorium A.
  • The A/V contractor mounted the projectors in Auditorium A.
  • The mechanical contractor insulated additional HVAC plumbing.

DENTAL SCHOOL PARKING LOT AND ROAD REPAIRS:

  • Facility Services continued maintenance and repairs to the student parking lots.

DENTAL 6TH AND 8TH FLOOR LAB RENOVATIONS:

  • Lab chairs were delivered and installed in Suite 8405