Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, JUNE 19, 2009

1542 TULANE AVE.:

  • The networking contractor installed network drops in 2nd floor offices along Tulane Avenue.
  • The flooring contractor installed carpet in the auditorium.
  • Facility Services repaired the ceiling in offices 228, 236, 240A, and 241.
  • Workers continue to make electrical repairs and paint on the 2nd Floor.

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor continued working on touch-up painting and cleaning on the 6th Floor.

ALLIED HEALTH/NURSING BLDG RE-ROOFING PROJECT:

  • The contractor installed walk pads near the elevator penthouse.

LIBRARY COMMONS:

  • The contractor continued finishing the sheetrock in the stairwell.

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor installed grid for the gypsum board ceiling in the recreation room.
  • The interior contractor completed prepping the gypsum board ceiling in the expanded lobby area.

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services removed temporary units from Quadrant D and completed installing temporary units in Quadrant C of the 6th and 7th Floors.
  • The contractor continued balancing AHU 6D and 7D.
  • They began preparations for removal of the old AHU 6C and 7C and for installation of the new units.

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing metal trim and wood panels on the television monitor wall.
  • The contractor installed four exit lights, installed two thermostats, finished installing outlets on the walls with wood panels and finished installing sconce lights by the metal panels.

MEB MDL #3 RENOVATIONS:

  • The contractor continued installing valves for air, gas, and vacuum.

MEB PHARMACOLOGY RENOVATIONS:

  • The contractor continued completing punch-list items.

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor continued the custom baseboard installation in Auditorium A.
  • The A/V contractor continued installing the podium in Auditorium A and connecting wiring and equipment.
  • The contractor successfully tested the fire alarm system in both auditoriums.

DENTAL PARKING LOT AND ROAD REPAIRS:

  • Facility Services painted new pavement markings in the student parking lots on Campus Road.