1542 TULANE AVE.:

  • The networking contractor continued to install network drops in Suite 235 . 
  • The flooring contractor installed additional carpet and cove base in the auditorium. 
  • Facility Services continues to make electrical and ceiling repairs on the 2nd Floor.

 

EXTERIOR/LANDSCAPING:

  • Facility Services installed irrigation piping around the Roman Street Garage on the Tulane Avenue and Bolivar Street sides.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor began repairing the exhaust fan caps on the roof.

 

LIONS SLIDING GLASS DOOR:

  • The contractor installed the sliding glass door and floated the threshold. 

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor installed walk pads near Roman Street .

 

LIBRARY COMMONS:

  • The contractor continued painting and installing the wall covering in the stairwell.

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed gypsum board to fur out walls in the recreation room.
  • The access control contractor ran wires for the card reader on both sliding doors.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued to adjust the temporary units in Quadrant C of the 6th and 7th Floors. 
  • The contractor continued balancing air handling units 6D and 7D.
  • They demolished and removed the old AHUs 6C and 7C.
  • Crews installed the new AHUs 6C and 7C and continued making ductwork and piping connections.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing wood panels on the television monitor wall and the soffit above the television monitor wall. 
  • The contractor began installing the meeting minders and the channel player for the television monitor.

 

MEB MDL #3 RENOVATIONS:

  • The casework contractor installed frames along the back walls of MDL 3. 
  • The contractor installed light fixtures in Room 4108, 4110, and 4209.
  • They continued relocating sprinkler heads in Room 4201.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed custom baseboard along the wing walls in Auditorium A. 
  • The A/V contractor continued installing the podium in Auditorium A; connecting wiring and equipment.