Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, JUNE 30, 2009

 

1542 TULANE AVE.:

  • The electrical contractor installed additional light fixtures in Room 108A. 
  • The furniture contractor installed office furniture and cubicles in the 2nd Floor offices along Tulane Avenue . 
  • The cleaning contractor cleaned offices on the 2nd Floor along the center corridor.
  • Facility Services painted the stage trim in the Auditorium.

 

ALLIED HEALTH/NURSING BLDG RE-ROOFING PROJECT:

  • The contractor completed installing the sheet metal flashing. 
  • The contractor installed the parapet wall cap along the MEB side of the roof. 

 

EXTERIOR/LANDSCAPING:

  • Facility Services completed installation of the irrigation piping around the S. Roman Garage. 

 

LIONS/LSU CLINIC PERMANENT REPAIRS & MITIGATION:

  • The contractor started pulling electrical wires for the conference room along Bolivar Street . 

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • Crews started installing the wavy ceiling grid in the expanded lobby area.
  • They continued installing ceiling grid and completed relocating sprinkler heads in the recreation room.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues to monitor and adjust the C Quadrant 6th and 7th Floor temporary units. 
  • The contractor continued installing controls for air handling units 6D and 7D and ductwork, piping, insulation and electrical for AHUs 6C and 7C.

 

MEB MDL #3 RENOVATIONS:

  • The casework contractor installed the center island pedestal.
  • Workers installed ceiling tiles and connected air, gas, and vacuum to the fixtures.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The auditoriums successfully passed Fire Marshal inspection. 
  • The contractor installed custom baseboard along the west wall of Auditorium B. 
  • They pulled network cables for the tables in Auditorium A.