Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JUNE 4, 2009

 

1542 TULANE AVE. :

  • The contractor placed additional concrete pads for the base of bollard lights along Tulane Avenue . 
  • Facility Services continues to install and connect fan coils in offices on the 2nd Floor. 
  • Carpenters are repairing the damaged section of built-in bookcases in Room 235N.
  • The contractor insulated piping for 3rd Floor fan coils.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued setting sandbags in preparation for hurricane season.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor removed the old fire pump controller panel and breakers from the 1st Floor, CSRB side.
  • Data lines were terminated in the network closet on the 6th Floor.
  • The mechanical contractor continued piping the fuel lines to the new fuel tank.

 

LIONS BUILDING 8th FLOOR NETWORK CLOSET:

  • The contractor completed continued taping and floating the network closet. 

 

LIBRARY COMMONS:

  • The contractor replaced ceiling panels above the coffee kiosk. 
  • The contractor dismantled the wall by the stairwell.

 

RESIDENCE HALL 2ND FLOOR LOBBY EXPANSION:

  • The interior contractor installed gypsum board on the expanded lobby area ceiling.
  • They removed existing pull stations by all three elevators. 
  • The mechanical contractor installed diffusers along the new storefront wall.

 

ALLIED HEALTH/NURSING BLDG RE-ROOFING PROJECT:

  • The contractor installed aluminum flashing along the Bolivar Street side of the roof.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • LSUHSC Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floors Quadrant D. 
  • The contractor completed the installation of the chilled water and sprinkler piping and the condensate drains.
  • They installed one air flow monitoring station on AHU 6-D. 
  • Work continued on heating hot water lines, mounting variable flow devices, and connecting building automation controls for AHU 6D. 
  • The contractor completed and tested chilled water and heating hot water piping, completed installing sprinkler piping and installed two air flow monitoring stations on AHU-7D.  
  • Work continues connecting the motor, mounting variable flow devices, and connecting building automation controls for AHU 7D.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed metal and wood wall panels by Lecture Hall A.

 

MEB MDL #3 RENOVATIONS:

  • The contractor taped and floated walls in the alcove area. 
  • The contractor continued installing track for the new partition panels.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed acoustical panels on the west wall of Auditorium B and installed additional framing along the wing walls. 
  • The AV contractor pulled wiring into the AV racks in Room 4202B.
  • The electrical contractor installed fire alarm devices in Auditoriums A, B, and C.