Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, JUNE 5, 2009

 

1542 TULANE AVE. :

  • The contractor constructed wood forms and installed wiring and conduit for the up-lighting along Tulane Ave.
  • The contractor relocated the emergency release mechanism for the roll-up gate in the parking garage. 
  • The contractor insulated piping for 2nd Floor fan coils.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued setting sandbags in preparation for hurricane season.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:   

  • The mechanical contractor continued piping the fuel lines to the new fuel tank.

 

LIONS BUILDING 8th FLOOR NETWORK CLOSET:

  • The contractor completed continued taping and floating the network closet. 

 

RESIDENCE HALL 2ND FLOOR LOBBY EXPANSION:

  • The interior contractor installed gypsum board on the mezzanine ceiling between the A and B Towers.
  • The contractor installed sheetrock for the network closet. 
  • The contractor taped and floated the gypsum board ceiling in the expanded lobby area. 

 

ALLIED HEALTH/NURSING BLDG RE-ROOFING PROJECT:

  • The contractor installed aluminum flashing along the Gravier St. side of the roof.
  • The contractor installed the white cap sheet along S. Roman Street .  

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues to monitor and make adjustments to the temporary air conditioning units for the 6th and 7th Floors Quadrant D.
  • The contractor completed installation of the heating hot water piping on AHU 6-D. 
  • Work continued on installing pipe supports, mounting variable flow devices, and connecting building automation controls for AHU 6D.
  • The contractor continued connecting the motor, mounting variable flow devices, installing pipe supports and connecting building automation controls for AHU 7D.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed metal and wood wall panels by Lecture Hall A.

 

MEB MDL #3 RENOVATIONS:

  • The contractor completed installation of the track for the new partition panels.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed additional acoustical panels on the north and west walls of Auditorium B and installed additional framing along the wing walls. 
  • The AV contractor continued pulling wire into the AV racks in Room 4202B. 
  • The contractor fire sealed the gypsum walls above the ceiling in Rooms 4202B and 4202C. 
  • Workers installed ceiling tile in Room 4202C.

 

DENTAL SCHOOL PARKING LOT AND ROAD REPAIRS:

  • The contractor completed paving Parking Lots 2 and 6.
  • They continued making repairs to the Moss Street entrance driveway.
  • Crews built the concrete forms for various concrete road and apron repairs.