Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JULY 23, 2009

 

1542 TULANE AVE. :

  • Facility Services applied touch-up paint in the 1st floor offices along the Tulane Ave. side of the building.
  • Facility Services continues to make electrical repairs in rooms 235J & 235K.
  • The contractor removed the cinderblock pipe chase on the 1st and 3rd Floors of the parking garage.

 

EXTERIOR LANDSCAPING:

  • Facility Services completed the removal of plant material from the front of the Roman Street Garage along Tulane Avenue and began the final grading.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor terminated 6th Floor data lines in the conference room tables and in the network closet.
  • Workers ran conduit to the temporary MRI trailer for the disconnect switch and transformer. 

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The contractor completed installing wood cladding around the network closet.
  • They finished installing the ceiling tiles in the recreation room.
  • The contractor continued priming the new walls in the C Tower lobby area.

 

ALLIED HEALTH/NURSING BLDG. ROOF REPLACEMENT:

  • The contractor removed and re-applied the existing caulk in the joints along the Bolivar Street side of the Atrium.
  • They installed aluminum flashing around the 4th Floor ledge near Bolivar Street .

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting temporary AC units for the B Quadrant (corner of Perdido Street and South Roman Street ).
  • The contractor completed installing the new insulation, electrical wiring, and controls for air handling unit 6-B.
  • They continue installing new hot water piping for air handling unit 7-B and began testing both units.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing carpet in Medical Center Stores.
  •  Workers continued smoothing the pans of the concrete ceiling.

 

MEB MDL #3 RENOVATIONS:

  • The contractor installed cove base along the perimeter wall.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor continued to work on punch-list items in both auditoriums.
  • The A/V contractor continued to test and make adjustments to the A/V equipment at the podiums in Auditorium A.