Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, JULY 6, 2009

 

1542 TULANE AVE. :

  • Facility Services continues to make electrical repairs on the 2nd Floor.

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor continued installing the parapet wall cap along Bolivar and Perdido Streets.

 

EXTERIOR/LANDSCAPING:

  • Facility Services installed sprinkler station #1 on the Tulane Ave. side of the Roman St. Garage.  

 

LIBRARY COMMONS:

  • The contractor began installation of the break metal at the stairwell.        

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor removed existing fire alarm devices.

 

LIONS/LSU CLINIC PERMANENT REPAIRS MITIGATION:

  • The contractor continued pulling network wires for the conference room along Bolivar Street and in the large lecture hall. 

 

RESIDENCE HALL 2nd FLOOR LOBBY EXPANSION:  

  • The contractor continued installing the wavy ceiling grid in the expanded lobby area.
  • Gypsum board was installed for the ceiling in the recreation room.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues to monitor and adjust the C Quadrant 6th and 7th floor temporary units.
  • The contractor continues installing piping, insulation, electrical and controls for AHU 6C.

 

MEB MDL #3 RENOVATIONS:

  • The contractor connected drain lines for the cabinet sinks. 
  • The casework contractor installed cantilever frames and panels.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The A/V contractor pulled wiring for the video cameras in Auditorium A and installed the projector screen.