The contractor pulled data wires for the 1st Floor lounge coffee kiosk.
Facilities Services installed locks on all kiosk cabinets.
DENTAL SCHOOL
AUDITORIUM A & B RENOVATIONS:
The A/V contractor installed the projectors in Auditorium B.
The contractor relocated a smoke detector in Auditorium B.
EXTERIOR/LANDSCAPING:
Facility Services began grading on the Gravier Street side of the Roman Garage.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services monitored and adjusted the temporary A/C units serving the 4th and 5th Floor Quadrant D (corner of Bolivar Street and Perdido Street ).
The contractor continuing installing new ductwork and piping for AHU 4-D and 5-D.
MEB
7th FLOOR PHYSIOLOGY LABS RENOVATION:
The contractor completed roughing in the electrical service for Rooms 7221 and 7244.
The contractor painted walls in Rooms 7221, 7241, 7244, and 7250
RESIDENCE
HALL 2nd FLOOR LOBBY RENOVATIONS:
The contractor roughed in the electrical service in the new security desk.
The contractor began the final clean-up.
ALLIED
HEALTH/NURSING BLDG. REROOFING PROJECT:
The contractor installed aluminum flashing on the 4th Floor roof along Bolivar Street .
RESOURCE CENTER REROOFING PROJECT:
The contractor removed the existing UPS penthouse roof on the Tulane Ave. side of the building.
They lowered two roof drains and applied a two-ply roofing system.