The contractor primed the 1st Floor bathrooms behind the coffee kiosk and installed sheetrock on the rear wall of the kiosk area.
The plumbing contractor completed roughing in the kiosk.
ALLIED
HEALTH/NURSING BLDG. ROOF REPLACEMENT:
The contractor core-drilled the corner penetrations.
DENTAL SCHOOL
AUDITORIUMS A & B RENOVATIONS:
The electrical contractor terminated additional network wires for Auditorium A.
The A/V contractor continued programming the lighting and control panel for the podiums.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in the A Quadrant (corner of South Roman Street and the MEB loading dock).
The contractor completed installation of the duct connections between the hot and cold deck for air handling units 6-A and 7-A.
Workers completed the chilled water piping at AHU 6-A and continue piping chilled water to AHU 7A.
The condensate drain for AHU 7A is complete and the contractor continues piping condensate drains at 6A.
Electrical wiring and control wiring installations have begun on both AHU 6A and 7A.
Testing and balancing of AHU 6-B and 7-B continues.
LANDSCAPING:
Facility Services continued laying sod on the Tulane Avenue side of the Roman Street Garage.
This work was delayed while a large section of defective 2†irrigation piping was removed and new pipe reinstalled.
MEB
7TH FLOOR PHYSIOLOGY LABS RENOVATIONS:
The contractor installed sheetrock to close up the blocking in Room 7221.
Crews installed stud channel for the soffit ceiling in Room 7250.
RESIDENCE
HALL 2nd FLOOR LOBBY RENOVATIONS:
The network contractor continued running network wires.
The contractor installed supply air HVAC grilles and installed carpet in the recreation room.
The contractor began painting in the mezzanine area between the B & C Towers .