  • The contractor applied the 2nd coat of paint in the restrooms behind the coffee kiosk. 
  • Facility Services applied touch-up paint to the handrails in Stairwell #3.
  • The electrical contractor pulled wires through the ceiling for the kiosk equipment.

 

ALLIED HEALTH/NURSING BLDG. ROOF REPLACEMENT:

  • The contractor pressure washed the sidewalk where the elevator was installed and removed excess material from the roof.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor applied floor sealant in the new AHU room and filled the concrete holes in the electrical closet between the auditoriums. 
  • The A/V contractor installed the dimmer control card and is programming the card. 

 

LANDSCAPING:

  • Facility Services completed laying the delivered sod on the Tulane Avenue side of the Roman Street Garage. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting the temporary A/C units in the A Quadrant (corner of South Roman Street and the MEB loading dock).
  • Power wiring and control wiring installations continue on both AHU 6A and 7A.
  • Sprinkler contractor continued the sprinkler installation on 6A.
  • Testing and balancing of AHU 6-B and 7-B continues.

 

MEB 7TH FLOOR PHYSIOLOGY LABS RENOVATIONS:

  • The contractor roughed in plumbing in Room 7244.
  • They removed existing vinyl floor in Room 7207 (walk-in cooler)
  • The contractor continued framing the soffit ceiling in Rooms 7241 and 7250.

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The contractor continued painting in the corner lobby area C tower.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The crane, man lift, and dumpster were delivered to the site today.