Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, SEPTEMBER 11, 2009

 

1542 TULANE 1st FLOOR GARAGE ENTRANCE:

  • The contractor continued installing furring channel at the 1st Floor garage/building entrance

   

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services started the temporary A/C units in the 4th and 5th floor Quadrant C (corner of Bolivar Street and MEB loading dock) and began monitoring.
  • The contractor closed Bolivar Street , set-up their crane and started preparations for the 6:00 PM demolition start on AHU 4-C and 5-C. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor installed new lab furniture in Room 7244.
  • Crews trimmed out receptacle outlets in Rooms 7241 & 7250.

 

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATION:

  • The contractor delivered and set up furniture throughout the 2nd Floor.

 

RESOURCE CENTER 6TH FLOOR ELEVATOR LOBBY:

  • The contractor completed installing wall covering in the elevator lobby area.