NOTICE:  There will be a building-wide air conditioning outage at the Clinical Education Building - 1542 Tulane Avenue - starting at 6:00 PM on Friday, September 4th, and lasting until 6:00 PM on Saturday, September 5th.  Contractors will be re-routing chilled water lines in the basement and parking garage.  During this outage, the building will have no air conditioning.

 

1542 TULANE AVE. :

  • The contractor re-routed electrical conduit in the garage at the 1st Floor ADA Ramp.
  • Workers laid floor tile in Room 122F (Womens Restroom).
  • The contractor installed door locks for the pipe chase in the parking garage.

    

ALLIED HEALTH/NURSING BLDG. REROOFING PROJECT:

  • The contractor continued to repair the metal panels of the atrium roof.

 

DENTAL SCHOOL AUDITORIUM A & B RENOVATIONS:

  • The A/V contractor continued making programming adjustments to the A/V and podium equipment in Auditorium B.
  • The network wiring crew pulled network wires for the wireless access connections in Auditoriums A and B.

 

EXTERIOR/LANDSCAPING:

  • Facility Services laid sod and planted trees beside the Roman Garage along Gravier Street .
  • They continued the demolition of asphalt around the perimeter of the T-lot.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services monitored and adjusted the temporary A/C units to the 4th and 5th Floor Quadrant D (corner of Bolivar Street and Perdido Street ).
  • The contractor continued installing electrical and controls for air handling unit 4-D and 5-D. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor continued installing light fixtures in Rooms 7221 and 7244.
  • The contractor began installing new lab furniture in Room 7241.

 

RESIDENCE HALL 2nd FLOOR LOBBY EXPANSION:

  • The contractor installed the wall covering behind the security desk area and on the wall adjacent to the mailboxes.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor lowered five additional roof drains and applied the two-ply temporary roof system on the Tulane Avenue Side of the building.
    • They have completed work on 17 of 34 roof drains.