1542 TULANE GARAGE ENTRANCES:

  • The contractor roughed in the electrical for the 2nd Floor entrance.

 

DENTAL SCHOOL FENCE REPLACEMENT:

  • The contractor removed the old fence posts along Florida Ave. and Moss St . 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services began setting up the temporary A/C units in the 4th and 5th Floor Quadrant B (corner of South Roman and Perdido streets).
  • The contractor completed the control work for AHU 4-C and 5-C. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor installed shelves in Rooms 7241 and 7250.
  • The contractor is terminating network data jacks in Room 7221.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor continued demolition along Perdido Street and applied a two-ply roof.
  • The contractor completed all the X-rays of the roof in preparation for drilling. 

 

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATION:

  • The contractor corrected the smoke detectors and the pull station zone coverage issue.
  • Facility Services conducted a successful audio test for the fire alarm system.