NOTICE: On Saturday, September 5th, from 7:00 AM to 10:00 AM there will be a limited power outage at the Medical Education Building .  During this time, there will be no make-up air available from the roof top A/C units.  Since the exhaust will not be operating, this will have minimal effect.  No exhaust fans will be able to operate.  This means no exhaust for gross labs, morgue, restrooms and all fume hoods.  The crematory will also not be able to operate.  The electricians will be opening up and inspecting the distribution panels on the roof as well as testing the feeder cables and conducting an infrared inspection of the panels and transformers.

 

1542 TULANE AVE. :

  • The contractor connected the gas line piping on the 1st level of the parking garage.
  • They removed the metal door and frame at the 1st Floor garage/building entrance.
  • Workers touched-up the paint on the walls and door frames in restrooms behind the coffee kiosk area.

   

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor continued to repair the metal panels on the parapet wall of the atrium roof.

 

DENTAL SCHOOL AUDITORIUM A & B RENOVATIONS:

  • The A/V contractor installed the microphones for the podium in Auditorium B and adjusted the volume settings.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued removing the asphalt around the perimeter of the T-lot.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services monitored and adjusted the temporary A/C units for the 4th and 5th Floor Quadrant D (corner of Bolivar Street and Perdido Street ).
  • The contractor continued testing and balancing air handling units 4-D and 5-D. 

 

RESIDENCE HALL 2ND FLOOR LOBBY EXPANSION:

  • The contractor installed the swing door for the security desk.
  • They trimmed out the electrical outlet for the security desk.

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor continued installing new lab furniture in Room 7250.
  • The contractor installed HVAC supply grilles in Room 7221.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor lowered six roof drains and applied the two-ply temporary roof system on the corner of S. Prieur Street and Gravier Street of the building.
    • They have now completed 30 of the 34 roof drains.