Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, OCTOBER 14, 2009

 

1542 TULANE AVE. :

  • The contractor painted the sheetrock in the auditorium.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued installing the irrigation piping along Bolivar Street.
  • Crews planted shrubs and mulched at the corner of Gravier Street and Bolivar Street .

 

LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS:

  • Facilities Services continued demolition of the conference and lobby areas.
  • The contractor completed the final plumbing connections to the Liebert unit.   

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring temporary A/C units in the 4th and 5th Floors Quadrant B (corner of South Roman Street and Perdido Street ).
  • The contractor continued working on the electrical wiring and controls installation for AHUs 4-B and 5-B.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor continued removing ceiling grid, tiles and existing light fixtures.
  • Workers began raising the steel beam that supports the partition track.

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATIONS:

  • The contractor is working on punch list items.
    • They labeled the circuits for the wire mold, installed ceiling tiles, and repaired floor tiles.

 

RESIDENCE 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing the precast panel below the walkway.

 

UPTOWN CAMPUS:

  • The contractor continued cleaning the chilled water loop piping in preparation for connection to the main hospital building.