Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, OCTOBER 29, 2009

 

1542 TULANE AVE. :

  • The contractor honed the terrazzo floors and cleaned the marble walls outside of Room 203.
  • The contractor installed the stainless steel cased opening for the 1st Floor Garage Entrance.

 

EXTERIOR/LANDSCAPING:

  • Facility Services winter flowers at various locations around the Downtown Campus and activated all irrigation stations around Roman Street Garage.
  • Facility Services installed conduit for lighting bollards on the Gravier Street side of the Roman Street Parking Garage.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
  • The contractor completed the hot water piping for air handling unit 5-A, and continued installing ductwork and piping for 4-A and 5-A.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor core drilled for the new plumbing.
  • The contractor roughed in plumbing in the main MDL room.

 

MEB 2ND FLOOR AUTOPSY ROOM HVAC UPGRADE:

  • The contractor removed exhaust duct in the chase by the 2nd Floor stairwell.
  • The contractor roughed in the electrical wiring.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor replaced one row of glass panels in the atrium roof nearest Tulane Ave.  

 

LIONS/LSU CLINIC 8TH FLOOR RENOVATIONS:

  • The contractor opened up the new entrance to the conference room along Gravier Street . 

 

CITY PARK CAMPUS:

  • The contractor installed additional wire ties for the chain-link fencing along Florida Avenue .

 

UPTOWN CAMPUS CHILLER REPLACEMENT:

  • The contractor continued to install insulation on piping and valves.
  • The contractor held training on new chiller operations for LSUHSC and Jani-King personnel.