The contractor installed lights in the 2nd Floor garage entryway and painted the corridor.
CITY
PARK CAMPUS:
The contractor installed additional wire ties for the chain-link fencing along Florida Avenue .
EXTERIOR/LANDSCAPING:
Facility Services repaired the irrigation station on Bolivar Street between the CSRB and the Lions/LSU Clinic Building.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
The contractor continued installing hot water piping for air handling unit 5-A, and ductwork for AHU 4-A and 5-A.
MEB
4TH FLOOR MDL #4 RENOVATIONS:
The contractor raised HVAC duct in the main MDL room.
They continued roughing in the new plumbing and electrical in the main MDL room.
The contractor installed sheetrock in Room 4210.
MEB
2ND FLOOR AUTOPSY ROOM HVAC UPGRADE:
The contractor installed new exhaust duct on the 2nd Floor by the freight elevator.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor replaced the break metal surrounding the glass windows along Tulane Ave.
UPTOWN
CAMPUS CHILLER REPLACEMENT:
The engineers, LSUHSC and Facility Planning and Control met with contractor on site and developed the punch list.