Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, OCTOBER 5, 2009

 

1542 TULANE GARAGE ENTRANCES:

  • The contractor placed additional concrete for the curbs at the 1st Floor ADA entrance.
  • The contractor taped and floated the walls for the 2nd level garage entrance corridor.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued installing irrigation piping adjacent to the Roman Garage along Bolivar Street .

 

LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS:

  • Facilities Services continued demolition of the conference and lobby areas.
  • The general contractor installed studs in Room 804 (lab area that is being converted into the conference room). 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring temporary A/C units in the 4th and 5th Floor Quadrant B (corner of South Roman Street and Perdido Street ).
  • The contractor demolished the old AHU 4-B and 5-B.
  • Workers installed the new AHU 4-B and 5-B, new ductwork and new piping. 

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor prepared for tonights asbestos abatement work. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATIONS

  • The contractor terminated the network cables in the network closet.

 

RESIDENCE HALL LOBBY RENOVATIONS:

  • The contractor began placing and setting the precast stone on the concrete wall.

 

RESOURCE CENTER ROOFING PROJECT:

  • The contractor cored the four roof penetrations.