1542 TULANE AVE. GARAGE ENTRANCES:

  • The contractor installed wire mesh and the wooden form for the ramp.
  • Workers sanded the sheetrock wall on the 2nd Floor corridor.

 

1542 TULANE AVE. AUDITORIUM:

  • The contractor installed conduit for power and data on the stage.
  • They removed existing screen and plywood backboard.

 

EXTERIOR/LANDSCAPING:

  • Facility Services installed shrubs around the perimeter of T-lot and shrubs and sod in front of the Central Utility Plant.

 

LIONS/LSU CLINIC 8TH FLOOR RENOVATIONS:

  • Facilities Services continued demolition of the conference and lobby areas.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring temporary A/C units in the 4th and 5th Floor Quadrant B (corner of South Roman Street and Perdido Street ).
  • The contractor continued installing ductwork and hot water piping for AHU 4-B and 5-B.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor continued removing the old floor tile. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATIONS:

  • The contractor installed cove base in all four labs. 
  • They trimmed out receptacle outlets for the wire mold in all four labs. 
  • Crews installed fume hood enclosure in Rooms 7244 and 7250.

 

RESOURCE CENTER ROOFING PROJECT:

  • The contractor placed another two-ply roofing system over the lightweight concrete at the main mechanical penthouse.