The contractor painted the ceiling tiles in the main corridor outside of the 2nd Floor garage entrance and installed the access panel in Room 202.
CITY
PARK CAMPUS:
The contractor installed the top rail, bottom rail, and fence fabric along the de Saix Subdivision from Moss Street to the security camera.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
The contractor completed the electrical work for AHU 4-A and 5-A.
Workers continued installing the controls for AHU 4-A and 5-A.
LIONS/LSU
CLINIC BLDG. 8TH FLOOR RENOVATIONS:
The contractor completed framing for the mail room and started framing the ceiling fur down along the lab side.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor replaced one additional row of glass.Four out of fourteen rows have been completed.
The contractor completed the plywood backing installation along South Prieur St. and started the first ply of flashing along Bolivar Street .
MEB
AUTOPSY HVAC EXHAUST UPGRADE:
The contractor continued to hang new exhaust ducts near the freight elevator.
RESIDENCE
HALL LOBBY RENOVATIONS:
The contractor delivered the lift the site.
The contractor installed the tile surrounding the concrete bench.
MEB
MDL 4 RENOVATIONS:
The contractor taped and floated the walls in Room 2104.