1542 TULANE AVE. :

  • The contractor installed cove base on the 2nd floor entrance.
  • They pulled wire for the fire alarms at the 1st Floor entrance.

 

CITY PARK CAMPUS:

  • The contractor demolished the third section of chain link fence from the staff parking lot to Navy Rd. adjacent to the de Saix Subdivision.
  • Workers set the second section of fence posts from the security camera to the staff parking lot adjacent to the de Saix Subdivision. 

 

EXTERIOR/LANDSCAPING:

  • Facility Services repaired irrigation sprinklers around the Downtown Campus. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
  • They began making preparations moving the temporary A/C units to Quadrant D of the 2nd and 3rd Floors.
  • The contractor continued balancing and testing AHU 4-A and 5-A.   

 

LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS:

  • The contractor continued framing the fur down in the large conference room and in the main lobby area.   

 

NEUROBIOLOGY LAB RENOVATIONS:

  • The contractor removed drywall and millwork from the room.

 

MEB MDL 4 RENOVATIONS:

  • The contractor roughed-in the plumbing on the Gravier St. side of the room.