The contractor installed cove base on the 2nd floor entrance.
They pulled wire for the fire alarms at the 1st Floor entrance.
CITY
PARK CAMPUS:
The contractor demolished the third section of chain link fence from the staff parking lot to Navy Rd. adjacent to the de Saix Subdivision.
Workers set the second section of fence posts from the security camera to the staff parking lot adjacent to the de Saix Subdivision.
EXTERIOR/LANDSCAPING:
Facility Services repaired irrigation sprinklers around the Downtown Campus.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
They began making preparations moving the temporary A/C units to Quadrant D of the 2nd and 3rd Floors.
The contractor continued balancing and testing AHU 4-A and 5-A.
LIONS/LSU
CLINIC BLDG. 8TH FLOOR RENOVATIONS:
The contractor continued framing the fur down in the large conference room and in the main lobby area.
NEUROBIOLOGY
LAB RENOVATIONS:
The contractor removed drywall and millwork from the room.
MEB
MDL 4 RENOVATIONS:
The contractor roughed-in the plumbing on the Gravier St. side of the room.