1542 TULANE AVE. EXTERIOR SIGN:

  • The contractor cleaned and prepared the exterior wall for the new sign. 

 

1542 TULANE AVE. ADA ENTRANCE:

  • The contractor primed the hand rails. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C in Quadrant C of the 2nd and 3rd Floors.
  • The contractor continued the electrical installation on AHU 2-C and AHU 3-C.
  • Crews continued the duct work and exhaust fan installation in mechanical room 2-A.
  • They completed repairs to the heating coils for AHU 6-C. 

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued to rough in the power and run conduit for the large conference room. 

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor continued installing metal studs for the laboratory walls.
  • They installed supports for the plumbing vent lines.

 

MEB MDL 4 RENOVATIONS:

  • The contractor began installation of the lab furniture in the main MDL room.

 

MEB AUTOPSY HVAC UPGRADE:

  • The contractor installed ductwork above ceiling inside the Womens bathroom.
  • The chemical storage cabinet was connected to the exhaust system.
  • The plumbing rough in for the autopsy tables was completed.

 

MEB SEMINAR ROOM A/V INSTALLATION:

  • The contractor began the installation of the new A/V equipment in Seminar Room 6. 

 

WET VACCUM TANK REPLACEMENT:

  • The contractor installed the new vacuum tank and wash-down lines in the Clinic Bldg. basement.