Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, DECEMBER 16, 2009

 

1542 TULANE AVE. PARKING GARAGE ENTRANCE

  • The contractor installed return registers for the fan coil unit at the 2nd Floor entrance.

 

FENCE REPLACEMENT PROJECT:

  • The contractor installed gate posts for swing gates at the Castine Street and DeSaix Street entrances.

 

LIONS/LSU CLINIC BLDG 8TH FLOOR RENOVATIONS:

  • The contractor cored 8 of 10 holes in the concrete floor. 
  • Crews installed conduit and electrical wire in the large conference room.

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor cored 9 of 9 holes in the concrete floor. 
  • They roughed in electrical conduit and boxes for lighting.

  

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C in Quadrant C of the 2nd and 3rd Floors.
  • The contractor continued the ductwork installation on AHU 2-B and started installing the piping for AHU 2-B.
  • Workers continued the duct work and exhaust fan installation in mechanical room 2-A.
  • They continued the electrical and controls installation on AHU 3-C. 

 

MEB AUTOPSY HVAC UPGRADE:

  • The contractor began piping the acid waste vent line for the chemical storage tank in the autopsy room.
  • The soffit above the cooler doors and the wall inside the storage room were painted.
  • The electricians began wiring the VAV boxes in the autopsy room.

 

MEB MDL 4 RENOVATIONS:

  • The contractor continued installing the new lab furniture in the main MDL room.
  • Electrical power was connected to the new light fixtures.

 

MEB SEMINAR ROOM A/V INSTALLATION:

  • The contractor installed electrical power for the projection screen in Seminar Room 6.
  • They installed the new screen in Seminar Room 10.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor installed hat channel on parapet wall on the Bolivar street side to support the parapet metal panels.