Facility Services continued installing irrigation piping at the corner of Bolivar Street and Poydras Street adjacent to the Residence Hall parking lot.
FENCE
REPLACEMENT PROJECT:
The contractor removed the swing gates and posts located at the Castine St. and Campus Rd. entrances.
1542 TULANE AVE.
1ST FLOOR ADA
ENTRANCE:
The contractor painted the safety bollards, fire-sealed the pipe penetrations, and resealed the concrete ramp.
1542 TULANE AVE.
2ND FLOOR GARAGE ENTRANCE:
The contractor installed and painted the door and frame for the construction wall outside of Room 203.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services completed the installation of the temporary A/C units in Quadrant C of the 2nd and 3rd Floors.
The contractor began demolition of AHU 2-C and AHU 3-C.
Crews completed the installation of AHU 2-C and the installation of ductwork for AHU 2-C.
LIONS/LSU
CLINIC BLDG 8TH FLOOR RENOVATIONS:
The contractor continued hanging sheetrock in the copy room.
The contractor roughed-in electrical receptacles in the Directors office.
MEB
MDL 4 RENOVATIONS:
The contractor continued relocating sprinkler heads and fabricated the gas pipe in the main MDL room.
MEB
AUTOPSY HVAC UPGRADE:
The contractor installed sheetrock for the soffit in front of the cooler and built a wooden form for the new block walls.
RESIDENCE
HALL WATER PROOFING:
The contractor replaced the caulk for two additional floors.
The contractor has now completed 6 of 9 floors.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor continued installing white cap sheet on the S. Prieur Street side of the roof.