Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JANUARY 14, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to remove lights and electrical conduit on the 1st Floor.

EXTERIOR/LANDSCAPING:

  • Facility Services completed placing sod along Bolivar and South Roman streets adjacent to the Residence Hall.

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

  • The contractor continued to run electrical conduit in the lab and sand the interior walls.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor installed sheetrock on the front fur down in the main conference room.
  • The electrical contractor ran conduit for the A/V equipment.

RESOURCE CENTER ROOF REPLACEMENT PROJECT:

  • The contractor completed the parapet wall cap on the main elevator penthouse and continued installing the parapet wall cap and metal panels for the Tulane Ave. penthouse.
  • Crews completed sealing the atrium glass.

MEB AHU REPLACEMENT PROJECT:

  • Facility Services continued monitoring the temporary air conditioning serving the cafeteria kitchen area.
  • The contractor completed installing the hot water piping for AHU 3-A.
  • They continued installing hot water piping for AHU 2-A.
  • Workers continued the electrical and controls work on AHU 2-A and AHU 3-A.

1542 TULANE AVE.:

  • The contractor installed the new exterior signage.

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor core drilled in the autopsy room for the plumbing that will connect to the new table.

MEB 4TH FLOOR MDL #4 RENOVATION

  • The contractor installed countertops in the main MDL room and in Room 4210.
  • They continued to test the new A/V equipment in the main MDL room.