LIONS/LSU CLINIC BLDG. 7th FLOOR LAB RENOVATIONS:

  • The contractor continued to run electrical conduit in the lab.
  • Crews continued installing sheetrock in the lab and in the adjacent office spaces.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued running lighting conduit and pulling wires in the small conference room.
  • They began installing sheetrock in the conference room.
  • Workers began hanging the bracket for the large conference room lights.

MEB AHU REPLACEMENT PROJECT:

  • Facility Services began installing the temporary air conditioning serving the cafeteria kitchen area.
  • The contractor installed the new AHU 2-A, installed ductwork for AHU 2-A, demolished old AHU 3-A, and began installing ductwork.

MEB MDL 4 RENOVATIONS:

  • The contractor completed connecting the medical air/gas/vac lines to the new lab furniture and the acid waste lines to the lab sinks.
  • They painted the door frame in Room 4210.

MEB MORGUE HVAC UPGRADE:

  • The contractor continued installing the plaster ceiling in the Womens' bathroom.