ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing ceilings in Rooms 2B2 and 2B4.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 1st Floor between the new switchgear location and the tap box in Room 219.

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

  • The contractor installed ceiling tiles and ran heating hot water lines to VAV boxes.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor taped and floated the sheetrock in the large and small conference rooms.

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor connected the exhaust duct for the second autopsy table.

RESIDENCE HALL LOBBY ROOF FLASHING:

  • The contractor removed the plaster wall in apartment C31.

RESIDENCE HALL FIRE ALARM UPGRADE:

  • The contractor continued programming modules in the new fire alarm summary panel.
  • They completed connecting all devices on the mezzanine and 2nd Floor to the new panel.

FENCE REPLACEMENT PROJECT:

  • The contractor completed installing framing and rebar for the monumental fence columns.

EXTERIOR/LANDSCAPING:

  • Facility Services buried the irrigation station piping in the center of the horseshoe island.