Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, FEBRUARY 8, 2010

 

ALLIED HEATLH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor rerouted plumbing piping in the 1st Floor restrooms.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor continued installing conduit on the 1st Floor between the new switchgear location and the fire pump and between the new switchgear location and the tap box in Room 219.

 

LIONS/LSU CLINIC 7th FLOOR LAB RENOVATIONS:

·         The contractor installed thirty of the forty metal ceiling panels on the 6th Floor that were removed to do plumbing work.

 

LIONS/LSU CLINIC 8th FLOOR RENOVATIONS:

·         The contractor installed sheetrock in the circle part of the ceiling outside the large conference room.

 

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

·         The contractor roughed in the plumbing and ductwork for the second autopsy table.

 

RESIDENCE HALL LOBBY ROOF FLASHING:

·         The contractor installed the permanent metal flashing in apartment B34 and began welding it in place.

 

RESIDENCE HALL FIRE ALARM UPGRADE:

·         The contractor installed new smoke detectors on the 3rd to 7th Floor of the C Tower.

·         They continued programming modules in the new fire alarm summary panel.

 

EXTERIOR/LANDSCAPING:

·         Facility Services completed burying and backfilling trenches for the 2-inch main irrigation piping around the horseshoe drive.

·         They installed station piping and sprinklers on the right side of the Administration Building front steps.

·         Workers installed irrigation station piping between the Administration Building front steps and the Clinic Building steps.

·         Irrigation station piping was installed between the Clinic Building steps and Florida Avenue.

·         Trenches were dug for irrigation stations in the center island of the horseshoe drive.