TUESDAY, FEBRUARY 9, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor installed electrical receptacles on the west side of the 1st Floor. RESOURCE CENTER PERMANENT REPAIRS & MITIGATION: · The contractor continued installing conduit on the 1st Floor between the new switchgear location and the tap box in Room 219. RESIDENCE HALL PERMANENT REPAIRS & MITIGATION: · The contractor removed asphalt in the parking lot to prepare for construction of the new structure that will house the critical mechanical and electrical equipment. LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS: · The contractor relocated fire sprinklers in the lab area. · Crews installed the last ten ceiling panels on the 6th Floor removed for plumbing work. LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor taped and floated the sheetrock in the large and small conference rooms. MEB 2ND FLOOR AUTOPSY HVAC UPGRADE: · The contractor installed the second autopsy table and connected the plumbing. RESIDENCE HALL LOBBY ROOF FLASHING: · The contractor continued installing and welding in place the permanent metal flashing in apartment B34. RESIDENCE HALL FIRE ALARM UPGRADE: · The contractor continued programming modules in the new fire alarm summary panel and new smoke detectors on the mezzanine, 1st and 2nd Floors. |
| Disclaimer | © 2013 LSUHSC | Privacy Policy |