THURSDAY, MARCH 11, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduit in the main corridor on the 1st Floor.
  • Crews continue to run cast iron roof drain pipe on the 1st Floor.
  • Demolition began in Room 244.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor surveyed core locations for post tension cables in the 3rd-8th Floor electrical rooms.
  • They continued to run conduit from the new switchgear room to the ATS room on the 1st Floor.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor installed sheetrock underneath the storefront joining the two labs.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor installed the ceiling grid trim in the lobby area.
  • They started installing hangers for the ceiling grid in the large conference room.

FENCE REPLACEMENT PROJECT:

  • The contractor completed installing all of the fence hats.

RESIDENCE HALL FIRE ALARM REPLACEMENT:

  • The contractor continued testing the fire alarm system.

EXTERIOR/LANDSCAPING:

  • Facility Services installed landscape edging and planted shrubs in the center island.