FRIDAY, MARCH 19, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor tied in the 5 inch roof drain from the walkway and removed the old pipes. LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS: · The contractor installed sheetrock on the interior storefront wall. LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor installed 6 of 30 pieces of glass in the curved storefront. EXTERIOR/LANDSCAPING: · Facility Services activated and tested irrigation in the horseshoe at the School of Dentistry. |