ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor saw cut the floor in four locations to run drain lines for the bathrooms.

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

·         The contractor continued to prep the sheetrock wall and install insulation.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The contractor ran conduit from the network closet to the podium in the large conference room.

·         Facility Services installed 6 of 8 control valves for the new VAV boxes.

 

EXTERIOR/LANDSCAPING:

·         Facility Services continued trenching for irrigation piping and continued removing existing vegetation in the patio courtyard.