MONDAY, MARCH 22, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor saw cut the floor in four locations to run drain lines for the bathrooms. LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS: · The contractor continued to prep the sheetrock wall and install insulation. LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor ran conduit from the network closet to the podium in the large conference room. · Facility Services installed 6 of 8 control valves for the new VAV boxes. EXTERIOR/LANDSCAPING: · Facility Services continued trenching for irrigation piping and continued removing existing vegetation in the patio courtyard. |