ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS &MITIGATION:

·         The contractor ran conduit in the Tiger Room.

·         Crews started refurbishing the AHUs on the 1st Floor.  

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor completed drilling the 16 floor penetrations for the electrical riser and emergency fuel line. 

 

CEB COVERED WALKWAY:

·         The contractor continued demolition of the sidewalk that runs parallel to the District Entergy Garage and the sheet metal awning connected to the side of the building. 

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

·         The contractor installed insulation and sheetrock on the exterior hallway wall. 

 

LIONS/LSU CLINIC 8th FLOOR RENOVATIONS:

·         The contractor installed all 8 new VAV boxes.

 

EXTERIOR/LANDSCAPING:

·         Facility Services continued trenching for irrigation piping in the patio courtyard.