WEDNESDAY, MARCH 24, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS &MITIGATION: · The contractor ran conduit in the Tiger Room. · Crews started refurbishing the AHUs on the 1st Floor. RESOURCE CENTER PERMANENT REPAIRS & MITIGATION: · The contractor completed drilling the 16 floor penetrations for the electrical riser and emergency fuel line. CEB COVERED WALKWAY: · The contractor continued demolition of the sidewalk that runs parallel to the District Entergy Garage and the sheet metal awning connected to the side of the building. LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS: · The contractor installed insulation and sheetrock on the exterior hallway wall. LIONS/LSU CLINIC 8th FLOOR RENOVATIONS: · The contractor installed all 8 new VAV boxes. EXTERIOR/LANDSCAPING: · Facility Services continued trenching for irrigation piping in the patio courtyard. |