Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, MARCH 29, 2010

 

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor installed conduit to panel XLB2.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor continued to set steel rebar cages for the 12 pile caps.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor removed ceiling tiles from the main lobby on the 1st Floor.

·         Workers sanded the 1st Floor existing door frames.

·         They started installing conduit on the 1st Floor for the emergency generator.

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS

·         The contractor continued painting the walls and door frames and installed floor tile.

 

EXTERIOR/LANDSCAPING:

·         Facility Services graded the planting beds in the patio courtyard and repaired the concrete curb on the horseshoe drive side of the Administration Building.