WEDNESDAY, MARCH 31, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued lowering the drain line for the water closets on the 1st Floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • Concrete was poured for the 12 pile caps. .

RESOURCE CENTER PERMANENT REPAIRS AND MITIGATION:

  • The contractor continued installing conduit on the 1st Floor for the emergency generator.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor continued taping and floating the corridor wall.

EXTERIOR/LANDSCAPING:

  • Facility Services planted trees, shrubs and plants in four of five planters in the patio courtyard,
  • They connected the water supply to the irrigation piping system, flushed the lines, and bored into the basement to install the new sprinkler control wires.