WEDNESDAY, MARCH 31, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continued lowering the drain line for the water closets on the 1st Floor.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- Concrete was poured for the 12 pile caps. .
RESOURCE CENTER PERMANENT REPAIRS AND MITIGATION:
- The contractor continued installing conduit on the 1st Floor for the emergency generator.
LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:
- The contractor continued taping and floating the corridor wall.
EXTERIOR/LANDSCAPING:
- Facility Services planted trees, shrubs and plants in four of five planters in the patio courtyard,
- They connected the water supply to the irrigation piping system, flushed the lines, and bored into the basement to install the new sprinkler control wires.
|