ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued laying CMU block in the stairwell near the MEB loading dock.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor continued installing the new lab furniture.
  • Crews are connecting plumbing fixtures and installing electrical conduit in the lab furniture.

LANDSCAPING/EXTERIOR:

  • Facility Services continued installing irrigation piping on the parking lot side and along the Florida Avenue side of the Clinic Building at the Dental School.