ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • Crews continued laying CMU block in the corridor and restroom along the MEB loading dock.
  • Workers continue roughing in the electrical in the CMU block walls along Gravier Street.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor ran additional underground conduit in the electrical utility chase.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits for emergency power.

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

  • The contractor continued installing ceiling tiles in the corridors.

FENCE REPLACEMENT PROJECT:

  • The contractor poured the concrete for the Moss Street driveway.

DENTAL SCHOOL NORTH FIELD GRADING:

  • The contractor completed rough grading and continues cutting to the final grade contours.

LANDSCAPING/EXTERIOR:

  • Facility Services continued grading and removing roots on the parking lot side of the School of Dentistry Clinic Building.