Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, APRIL 5, 2010

 

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·        The contractor installed sewer and water lines for the 1st Floor restrooms on the Gravier Street side of the building.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·        The contractor back-filled around the pile caps.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·        The contractor created 3 floor penetrations in the Automatic Transfer Switch room and ran conduit through 2 of the new penetrations.

 

LIONS/LSU CLINIC 7th FLOOR RENOVATIONS:

·        The contractor started installing the lab furniture along the Gravier St. side of the lab.

 

CEB COVERED WALKWAY:

·        The contractor continued removing the old sidewalks near 1542 Tulane Ave.

 

EXTERIOR/LANDSCAPING:

·        Facility Services continued planting shrubs and plants in the patio courtyard and pressure washed the sidewalks.