RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor saw cut the pavement for the utility trenches on the Perdido Street and Bolivar Street sides.
  • Crews are building forms for the second level concrete slab.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued flood proofing the pits for Elevators 3 & 4.

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

  • The contractor continued installing wiring raceway.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued to patch the walls in the small and large conference rooms and the Directors office.
  • Workers continued repairing the ceiling grid near the lounge and restrooms.
  • The lighting contractor continued to install can lights in the large conference room.

LANDSCAPING/EXTERIOR:

  • Facility Services completed installing sod on the field side of the horseshoe drive at the School of Dentistry.