ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor removed the stairwell walls in the two stairwells near South Roman Street.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor continued forming the 2nd Floor and began placing reinforcing steel in the forms.
- Crews completed the second trench across the main driveway of the Residence Hall parking lot.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor continued construction of the CMU walls in the office areas and in the Womens restroom.
- They completed the CMU walls in the Mens restroom.
- Crews began installing the elevator pit equipment for Elevators 3 and 4.
- The contractor created 2 of 7 floor penetrations that are needed in the new switchgear room.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor completed installing the light pole electrical service conduit and backfilled the trenches.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor continued roughing in light fixtures for the large conference room.
- The glass was installed in the large conference room doors.