ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor installed CMU in the stairwell near the corner of the MEB loading dock and S. Roman Street.

·         They continue to run fire alarm cables to the second floor fire alarm panel.

·         Approximately half of the granite panels were removed from the elevator lobby.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor trenched an area under the basketball court near the oak tree for the plumbing piping and an area behind the basketball court for electrical conduit.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         14 of 25 conduits have been installed in the new switchgear room.

·         The contractor completed the 7 floor penetrations in the switchgear room.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The contractor began installing the ceiling tiles in the large conference room.

·         They continue installing the wood floor in the small conference room.

 

CEB COVERED WALKWAY:

·         The contractor started driving piles.