WEDNESDAY, JUNE 16, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor installed additional CMU block in the stairwell near the Bolivar and S. Roman Street. · They continue to run fire alarm cables to the 2nd Floor fire alarm panel. · The CMU block was removed from the elevator shaft. RESIDENCE HALL PERMANENT REPAIRS & MITIGATION: · The contractor trenched an area under the basketball court near Bolivar Street for the plumbing. RESOURCE CENTER PERMANENT REPAIRS & MITIGATION: · The contractor installed conduits in 1st Floor ceiling under the new switchgear room. · They began fabricating chilled water bypass piping in the 2nd Floor pump room. LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor began installing the ceiling tiles in the large conference room. · They completed installing the wood flooring in the small conference room. · Workers began installing the wood flooring in the Directors Office. CEB COVERED WALKWAY: · The contractor continued to drive piles. Approximate two thirds of the piles have been driven. |
| Disclaimer | © 2013 LSUHSC | Privacy Policy |