CEB COVERED WALKWAY:

  • The contractor re-graded the site after completion of pile installation.

ALLIED HEALTH/NURSING BLDIG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to run fire alarm cables to the 2nd Floor fire alarm panel.
  • The stud wall surrounding the 2nd Floor pump room and the ceiling in Room 262 were removed.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor continued installing concrete curbs.
  • They built the formwork for the corners and islands on the west end of the lot.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued installing carpet tile in the large conference room and lobby areas.
  • The AV contractor set the podium.
  • The aluminum storefront doors were installed.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor removed forms for the 1st level.
  • The underground waste line was installed by the C tower Roman Street side.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor poured concrete for the switchgear housekeeping pad.