TUESDAY, JUNE 29, 2010
CEB COVERED WALKWAY:
- The contractor re-graded the site after completion of pile installation.
ALLIED HEALTH/NURSING BLDIG PERMANENT REPAIRS & MITIGATION:
- The contractor continued to run fire alarm cables to the 2nd Floor fire alarm panel.
- The stud wall surrounding the 2nd Floor pump room and the ceiling in Room 262 were removed.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor continued installing concrete curbs.
- They built the formwork for the corners and islands on the west end of the lot.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor continued installing carpet tile in the large conference room and lobby areas.
- The AV contractor set the podium.
- The aluminum storefront doors were installed.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor removed forms for the 1st level.
- The underground waste line was installed by the C tower Roman Street side.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor poured concrete for the switchgear housekeeping pad.