Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JUNE 3, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor began installing ductwork along the steel beams.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed additional steel rebar for the second level slab.
  • Crews continued trenching on the S. Roman Street side of the parking area and installed more electrical conduit underground.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued placing CMU block in the elevator pit on the Bolivar street side.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor completed the last storm drain connection, installed new drain piping and erected the block walls for the first of 4 new catch basins. 

 

CEB COVERED WALKWAY:

  • The contractor continued to fill and grade the site at the 1542 patio.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor installed wall panel frames inside the large conference room.