Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, JUNE 7, 2010

 

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor installed new electrical lighting circuits on the 1st Floor and conduits for the fire alarm panels on the 2nd Floor.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor began installing new electrical conduits on the 2nd level concrete slab.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor laid CMU walls and ran electrical conduits in the office areas.

·         Crews installed conduit on the 1st and 2nd Floors.

·         The contractor completed blocking the shaft for elevators 3 and 4.

 

DENTAL SCHOOL PATIENT PARKING LOT:

·         The contractor completed backfilling the trenches for the new drain piping.

·         They began grading the site in preparation for the installation of the underground electrical wiring.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The contractor installed new wall panels in the large conference room.

·         They painted the office areas.

 

CEB COVERED WALKWAY:

·         The wood piles were delivered to the 1542 parking lot.

 

RESIDENCE HALL LOBBY RENOVATIONS:

·         The contractor is installing cladding on the handicap elevator lift.