TUESDAY, JULY 13, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The electrical contractor removed outdated telephone and data wires from the telecom room on the 2nd Floor.
- The 4th of 5 coats of fire proofing was applied to the structural steel beams.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The mechanical contractor continued installing the 1st of 4 elevated air handling unit platforms in the 1st Floor mechanical room.
- The elevator contractor continued removing the pit parts from Elevators 1 and 2.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continued installing the new electrical duct bank in the main driveway.
- The contractor continued installing steel rebar in the concrete forms for the enclosure roof.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor continued grading the parking area in preparation for the asphalt paving.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor continued painting and installed the wood ceiling panels.