MONDAY, JULY 19, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor installed the 1st Floor call buttons for Elevators 1, 2, and 3.
- A new electrical panel was installed on the 2nd Floor.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continues running electrical conduit on the 8th Floor.
- The general contractor removed the CMU shaft wall for Elevators 1 and 2 on the 1st Floor.
- The 2nd raised platform for an air handling unit was installed on the 1st Floor.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continues installing the new electrical duct bank in the main driveway.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor began applying the pavement markings.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The A/V contractor installed the podium in the large conference room.